1.855.384.7336 (38green)

Get a Quote

GD Grass Driveways

GD Grass Driveways

GD Grass Installation Guide

1) Create a sub-base suitable for the intended traffic load taking into account your sub soil ground conditions, then blend over the sub base with sharp sand and soil (GD 60/40 ratio) to form a continuous smooth base level.
2) Lay the grids and clip together to form one continuous matrix.
3) Fill the grids with structural soil (recipe supplied by GD Gravel) and damp down with water to allow the soil to settle into the cells.
4) Surface-dress the cells by covering with approximately 10-15mm of a mixture as per GD Gravel structural soil mix recipe.
5) Seed the area and water thoroughly. To aid grass growth, cover the seed with a top layer of fertilizer and water regularly for a period of 4 to 6 weeks.
 

Click Here for a GD Grass Fact Sheet & Installation Guide.
Click Here for more GD Gravel Resources.


We deliver Green Driveway products across North America and into Mexico.

 
Contact us for a project estimate or to purchase our materials for your personal or civic project.